
Took conceptual drawings from our customer, generated manufacturable CAD models and drawings. Laser cut assemblies in house, formed and welded them. Fully assembled and tested at our facility in California. Vents were shipped to New York. Our team met with the installing contractor and helped coordinate installation with what fasteners and sealants to use. This project shows our ability to coordinate with other trades in the construction industry and overall level of trust we’ve been given in the past with large government-funded entities with very strict rules and regulations.
Terms and Conditions
© 2026 CalWest MFG. All rights reserved.
(909) 351-0081
13815 Arrow Rte
Fontana, CA 92335
sales@calwestmfg.com